MDC LTI Batangas Technopark – Drainage Infrastructure, Padre Garcia, Batangas
In one of Southern Luzon’s fastest-growing industrial hubs, the MDC LTI Batangas Technopark in Padre Garcia is setting a benchmark for smart and sustainable infrastructure development. As part of its comprehensive master plan, a robust drainage system was required to handle large volumes of stormwater efficiently—ensuring both flood prevention and environmental compliance within the industrial estate.
Specifications | Details |
---|---|
Account | Corporate |
Pipe Used | Profiled & Covered Wall Pipe |
Application | Drainage |
Pipe ID/OD Size | 400mm & 1,600mm |
Pipe Length |
Specifications | Details |
---|---|
Pipe Quantity | 258 |
Ring Stiffness | SN 8 |
Pressure Rating | |
Location | Padre Garcia Batangas |
Duration | Ongoing -2024 |
KPMI supplied a range of Large-Diameter HDPE Pipes, with sizes varying from 400 mm to 1600 mm, totaling 253 pieces. The project used Profiled Covered Wall Pipes with a ring stiffness of SN8, specifically selected for their strength, flexibility, and performance in high-load and industrial settings.
What sets this installation apart is the adaptability of KPMI’s HDPE pipes to varying trench conditions and soil types. Whether shallow embedment or deeper utility corridors, the structural integrity of the system is maintained without the risk of corrosion, cracking, or root intrusion.
Installation speed was also a critical factor. The lightweight nature of the pipes—combined with easy on-site handling and secure jointing techniques—allowed for a swift deployment schedule, enabling MDC to meet its construction milestones with confidence.
The use of Large-Diameter HDPE Pipes in this industrial drainage system underscores KPMI’s commitment to innovation, sustainability, and long-term value for large-scale developments. With this infrastructure in place, the Technopark is well-positioned to support future growth while maintaining environmental integrity.