Enhancing Expressway Resilience: KPMI Supplies HDPE Drainage Pipes for SLEX Project in San Pedro, Laguna
To improve flood control and drainage capacity along a critical stretch of the South Luzon Expressway (SLEX), San Miguel Corporation (SMC) has undertaken a drainage infrastructure upgrade in San Pedro, Laguna. KPMI is proud to be part of this initiative by supplying Large-Diameter HDPE Pipes specifically designed for high-volume drainage systems.
Specifications | Details |
---|---|
Account | Corporate |
Pipe Used | Covered Wall Pipe |
Application | Hydro Electric Power Plant |
Pipe ID/OD Size | 1,600mm |
Pipe Length | 1302 |
Specifications | Details |
---|---|
Pipe Quantity | 217 |
Ring Stiffness | |
Pressure Rating | Gravity |
Location | San Pedro, Laguna |
Duration | Completed |
This project utilizes Covered Wall HDPE Pipes with an ID/OD size of 1600mm, chosen for their strength, chemical resistance, and long-term durability. Engineered to manage stormwater runoff efficiently beneath heavily trafficked roads, these pipes play a key role in mitigating flooding risks along the expressway.
Located in one of Laguna’s fast-developing urban corridors, the upgraded drainage system reflects the increasing need for robust infrastructure that can withstand both environmental stress and urban expansion. The use of HDPE technology ensures minimal maintenance and faster installation, resulting in reduced traffic disruptions during project execution.
KPMI’s Large-Diameter HDPE Pipes are a trusted solution across the Philippines for their reliability and superior performance in demanding civil engineering applications.
With this project, KPMI reaffirms its commitment to delivering sustainable piping solutions that support safer, more resilient transport systems for Filipino communities and commuters.