PUBLIC WORKS & HIGHWAYS

DPWH Construction Upgrading Rehabilitation of Drainage along Butuan-CDO Butuan

Strengthening Caraga’s Flood Control with Large-Diameter HDPE Pipes.

The DPWH Caraga Region, in its commitment to sustainable infrastructure, is spearheading the Construction, Upgrading, and Rehabilitation of the Drainage System along the Butuan–CDO National Road.

This critical initiative focuses on improving flood management and road resilience in Butuan City, Agusan del Norte, an area prone to seasonal heavy rainfall.

Client:

Services:

Specifications Details
AccountDPWH
Pipe UsedCovered Wall Pipes
ApplicationDrainage
Pipe ID/OD Size1,500mm & 2,000mm
Pipe Length
Specifications Details
Pipe Quantity
Ring Stiffness
Pressure Rating
LocationButuan City, Agusan del Norte
Duration

At the heart of this project are 1500mm and 2000mm Covered Wall Large-Diameter HDPE Pipes, supplied by Krah Pipes Manila. These high-performance pipes are engineered to handle extreme water flow and harsh environmental conditions, ensuring a long-lasting drainage solution for one of Mindanao’s busiest highway corridors.

Known for their superior load-bearing capacity and resistance to corrosion and chemical damage, Krah's Large-Diameter HDPE Pipes significantly reduce maintenance costs and improve overall system efficiency. This infrastructure upgrade not only enhances road safety but also safeguards surrounding communities from the impact of flooding.

GERMAN TECHNOLOGY, FILIPINO INGENUITY

Privacy Policy | Disclaimer | Whistleblower | Contact Us | FAQ

Copyright © Krah Pipes Manila, Inc. 2025

Privacy Policy  |  Disclaimer  |  Whistleblower  |  Contact Us  |   Copyright © Krah Pipes Manila, Inc. 2025

Scroll to Top