Enhancing Drainage Infrastructure in Palawan with KPMI’s HDPE Profiled Wall Pipes
The Narra Palawan Project, in partnership with Asanco Construction, utilizes KPMI’s 800mm Profiled Wall HDPE Pipes to strengthen the region’s drainage infrastructure. Spanning 120 meters with a total of 20 pipe segments, the system is designed to meet the demands of efficient stormwater management in a coastal and typhoon-prone area.
By choosing KPMI’s large-diameter HDPE pipe solution, the project ensures long-lasting durability, resistance to corrosion, and optimized flow performance—critical elements for a sustainable and resilient drainage system in Palawan’s evolving urban landscape.
This initiative reflects KPMI’s commitment to delivering reliable, future-ready infrastructure solutions across the Philippine archipelago.
Specifications | Details |
---|---|
Account | DPWH |
Pipe Used | Profiled Wall Pipes |
Application | Drainage |
Pipe ID/OD Size | 800mm |
Pipe Length | 120m |
Specifications | Details |
---|---|
Pipe Quantity | 20 |
Ring Stiffness | |
Pressure Rating | |
Location | Narra, Palawan |
Duration |
By choosing KPMI’s large-diameter HDPE pipe solution, the project ensures long-lasting durability, resistance to corrosion, and optimized flow performance—critical elements for a sustainable and resilient drainage system in Palawan’s evolving urban landscape.
This initiative reflects KPMI’s commitment to delivering reliable, future-ready infrastructure solutions across the Philippine archipelago.